Wednesday, 29 February 2012

Risk assessment


Potential danger
Potential outcomes
Actions to avoid potential outcomes
Further outcomes
Tripping over roots/brambles
Serious injury
Cuts/bruising
Film away from thick undergrowth

Risk of tripping over power cables
Electrocution
Serious injury
All cables to be kept above ground level and taped down
Sam will be supplying generator if we cannot get battery powered lights
Falling/tripping while filming running sequence
Broken limbs
Cuts/bruising
Concussion
Film in an open are with few obstructions

Falling from high stonework
Broken bones
Concussion
Bruising
Sensible foot wear
Extreme caution taken
Only film on easily accessible areas.

Slipping down banks etc. in the woods
Grazing
Bruising
Minor cuts

Do not film in wet conditions, this reduces risk of   slippery ground

filming update 29th feb

Last day of outdoor filming: Today we plan to re film some of our previous shots because most of them are quite shaky as we haven't used our tripod as much as we could have. Therefore we hope to obtain some more  professional looking shots to add to the video.

Monday, 27 February 2012

Costume ideas


Filming update

Today we have done some more filming around Ludlow castle in order to obtain some shots of jack looking out over the surrounding woodland and fields, where we have already filmed. This will help us to link the story in the music video  together, with a variety of close ups, medium and over shoulder shots and also the odd long shot. These combined camera shots will give the music video a more interesting look.

Monday, 20 February 2012

filming update

Hello blogging world I'm back after half term, ok so today we are going to get another load of filming done as we have a double lesson, we hope to gain at least half of the footage we need for the video by this stage