Potential
danger
|
Potential
outcomes
|
Actions
to avoid potential outcomes
|
Further
outcomes
|
Tripping
over roots/brambles
|
Serious
injury
Cuts/bruising
|
Film
away from thick undergrowth
|
|
Risk
of tripping over power cables
|
Electrocution
Serious
injury
|
All
cables to be kept above ground level and taped down
|
Sam
will be supplying generator if we cannot get battery powered lights
|
Falling/tripping
while filming running sequence
|
Broken
limbs
Cuts/bruising
Concussion
|
Film
in an open are with few obstructions
|
|
Falling
from high stonework
|
Broken
bones
Concussion
Bruising
|
Sensible
foot wear
Extreme
caution taken
Only
film on easily accessible areas.
|
|
Slipping
down banks etc. in the woods
|
Grazing
Bruising
Minor
cuts
|
Do
not film in wet conditions, this reduces risk of slippery ground
|
Wednesday, 29 February 2012
Risk assessment
filming update 29th feb
Last day of outdoor filming: Today we plan to re film some of our previous shots because most of them are quite shaky as we haven't used our tripod as much as we could have. Therefore we hope to obtain some more professional looking shots to add to the video.
Monday, 27 February 2012
Filming update
Today we have done some more filming around Ludlow castle in order to obtain some shots of jack looking out over the surrounding woodland and fields, where we have already filmed. This will help us to link the story in the music video together, with a variety of close ups, medium and over shoulder shots and also the odd long shot. These combined camera shots will give the music video a more interesting look.
Monday, 20 February 2012
filming update
Hello blogging world I'm back after half term, ok so today we are going to get another load of filming done as we have a double lesson, we hope to gain at least half of the footage we need for the video by this stage
Subscribe to:
Comments (Atom)
